🖶Print List

 

SUPPORT ON SUBMARINE CABLES INSTALLATION PROJECTS

 

Position, navigation and relevant support with surveyors on board the CLB "Atalanti" for the Deutsche Bucht Offshore Wind Farm submarine power cable laying and burial operations (ASSODIVERS Ltd.), 2018.
Position, navigation and relevant support with surveyors on board the CLB "Atalanti" for the Rampion Offshore Wind Farm submarine power cable laying operations (ASSODIVERS Ltd.), 2018.
Position, navigation and relevant support with surveyors on board the CLB "Atalanti" for the COBRA (COpenhagen - BRussels - Amsterdam) project first cable part laying and burial operations (ASSODIVERS Ltd.), 2017-2018.
Position, navigation and relevant support with surveyors on board the CSV "Ariadne", for the powerlink electrodes installation operations for the MONITA (MONtenegro - ITAlia) project (ASSODIVERS Ltd.), 2017.
Support PRYSMIAN Team with surveyors for the work supervision on board the survey vessels for the IFA2 (Interconnexion France-Angleterre 2) project marine survey (PRYSMIAN POWERLINK S.r.l.), 2017.
Support PRYSMIAN Team with surveyors for the work supervision on board the survey vessels for the NSL (North Sea Link) project marine survey (PRYSMIAN POWERLINK S.r.l.), 2017.
Support for the installation of high voltage submarine power cables of WESTERN HVDC LINK (Liverpool - U.K.), regarding data acquisition and proccessing of ROV based Multi Beam EchoSounder data (ASSODIVERS TECHNICAL, COMMERCIAL & SHIPPING Co. Ltd.), 2014.
Support in positioning and navigation for the installation of the submarine cable systems: BORWIN 2, HELWIN 1, MESSINA-II & SYLWIN 1 (KREOUSA SHIPPING COMPANY LTD & UNIVERSAL FAITH SHIPPING COMPANY LTD), 2012 - 2013.
Navigation and positioning services for the submarine F.O. telecommunication link of OTE, between Kimolos isl. And Milos isl. (LINK S.A.), 2011.
Bathymetric and topographic survey, and support for the installation of Pre Lay Shore Ends (PLSE), Pre-Lay Grapnel Run (PLGR) and Route Clearance Operation (RCO) for the Submarine Telecommunication System GBI in Qatar - India - S. Arabia. (MARITECH CONTRACTING & TRADING INT’L S.A.), 2010 - 2011.
Bathymetric and topographic survey, and support for the installation of Pre Lay Shore Ends (PLSE), Pre-Lay Grapnel Run (PLGR) and Route Clearance Operation (RCO) for the Submarine Telecommunication System MedNautilus in Instabul. (MARITECH CONTRACTING & TRADING INT’L S.A.), 2010.
Bathymetric and topographic survey, and support for the installation of Pre Lay Shore Ends (PLSE), Pre-Lay Grapnel Run (PLGR) and Route Clearance Operation (RCO) of the submarine communication cable between Chaleix – Pointe De L’ Artillerie in Noumea, N. Caledonia. (MARITECH CONTRACTING & TRADING INT’L S.A.), 2010.
Bathymetric and topographic survey, and support for the installation of Pre Lay Shore Ends (PLSE), Pre-Lay Grapnel Run (PLGR) and Route Clearance Operation (RCO) of submarine communication cable in Oman. (MARITECH CONTRACTING & TRADING INT’L S.A.), 2009.
Bathymetric and topographic survey, and support for the installation of Pre Lay Shore Ends (PLSE), Pre-Lay Grapnel Run (PLGR) and Route Clearance Operation (RCO) of the submarine telecommunication system SEACOM, in Maputo – Mozambique, Dar Es Salaam – Tanzania, Mumbai – India and Mombassa – Kenya. (MARITECH CONTRACTING & TRADING INT’L S.A.), 2009.
Bathymetric and topographic survey and support for the shore-end landings and protection works, of the submarine cables of the 12 telecommunication fibber optic links Zwara, Zawia, Tripoli, Khoms, Misurata, Sirte, Ras Lanuf, Brega, Benghazi, Tolmeta, Susah, Darnah, Tobruk, of the Libyan Fibber Optic Network (LFON). (MARITECH CONTRACTING & TRADING INT’L S.A.), 2001.
Topographic support at Reunion Isl. landing for the SAFE (South African Far East) submarine telecommunication link (MARITECH CONTRACTING & TRADING INT’L S.A.), 2001.
Consulting services for cable laying with burial and shore end installation for the submarine fibre optic telecommunication link of O.T.E between Mykonos – Paros – Naxos – Ios – Thira – Iraklion (FULGOR GREEK CABLES S.A.), 1998.
Consulting services for cable laying with burial and shore end installation for the submarine fibre optic telecommunication link of O.T.E between Preveza–Lefkada–Kefallinia–Zakinthos and Lechena (FULGOR GREEK CABLES S.A.), 1998.
Consulting services for cable laying with burial and shore end installation for Preveza - Kerkira and Igoumenitsa - Kerkira O.T.E. submarine telecommunication links (FULGOR GREEK CABLES S.A.), 1997.
Consulting services for the post laying cable burial for Lagonisi - Milos - Hania O.T.E. submarine telecommunication link (O.T.E. S.A.), 1996.
Navigation, positioning and consulting services for the cable laying and repair of the fibber optic telecommunication link of O.T.E. between Preveza and Corfu (FULGOR GREEK CABLES S.A.), 1996.
Navigation, positioning and consulting services for the cables laying of the fibre optic telecommunication link of O.T.E., between Lagonisi and Hania and branching to Milos via passive branching unit (FULGOR GREEK CABLES S.A.), 1995.
Navigation and positioning services for the submarine fibre optic telecommunication cables laying of O.T.E., between Corfu - Igumenitsa and Patra - Krioneri (FULGOR GREEK CABLES S.A.), 1994.
Consulting services for high voltage submarine cables laying between Perama - Salamina and Kefalonia - Zakinthos (CABLE DE LYON - FRANCE), 1986.
Planning and supervision of general geodetic works, hydrographic surveying, navigation and positioning, for the installation of 4 high voltage submarine power cables in Corfu Channel (FURUKAWA ELECTRIC Co - JAPAN), 1984.